For trucks entering Terminal 5 DO NOT back-up onto the Spokane St Swing Bridge. This can impact the ability of the bridge to open and have significant consequences for access to the waterway. Please arrive at terminal as close to your appointment time as possible, and always avoid back-ups onto the Swing Bridge.