Temporary lane closures should be expected along the East Marginal Way corridor between 7/12 and 7/21. A contractor for the Seattle Department of Transportation (SDOT) will be potholing locations along this corridor as part of the design of their future repaving project. Work will occur from 9am – 3pm and the contractor will be working from the north to the south between S Massachusetts St and Diagonal Ave S.